Re-plastering after damp treatment means hacking off, rendering and skimming, and the order matters most: find the cause, fix the cause, let it dry, then plaster. Plastering first hides it for one winter.

Post your plastering job to Premium membersTell us about your job once. Premium plasterers who cover your area can then contact you.Describe your job

Cutting back a wall surface during renovation

What this covers

What the job covers

  • Hacking off to a metre above the highest salt staining
  • Rendering in sand and cement with a salt retardant additive
  • Skimming the render once it has dried out
  • Plastering over a tanking system in a cellar or basement
  • Reinstating skirting and making good after the render has cured

What is involved

Replastering is the last step of a damp job and the shortest. The old plaster comes off to a metre above the highest salt staining, because the salts travel further up the wall than the water does and any that are left will come through whatever goes on top. The wall is then rendered in sand and cement with a salt retardant additive, left to dry, and skimmed.

The reason the specification is so specific is that hygroscopic salts, mostly nitrates and chlorides carried out of the masonry, pull moisture out of the air. A wall can be structurally dry and still show damp patches on the decoration because of them, which is why replastering after a damp course is part of the treatment rather than making good afterwards.

On a pre-1919 solid wall the whole approach is different. Those walls are meant to breathe. A cement render with a waterproofer, on a wall with no cavity, moves the problem up and along rather than solving it. That is a lime job.

A wall in section showing how far above the salt staining the old plaster has to be removedHighest salt stainingHack off to a metre ABOVE this lineHack off to here1mFloorSalts travel further than the damp does, so the render goes higher than the stain
Cutting back a wall surface during renovation

Hacking off to a metre above the highest salt staining, one of the jobs under re-plastering after damp.

Choosing someone for the job

Ask what caused the damp and what evidence points to that cause. Ask how high they are hacking off and why that height. Ask how long the render has to dry before the skim goes on. And on anything solid-walled and pre-1919, ask specifically whether lime is the right answer here, because cement on that wall is the expensive mistake.

Further reading: Replastering after damp: what has to happen, in order; Lime or gypsum plaster: why it matters on an old wall.

Related jobs:

Common questions

Do I have to replaster after a damp proof course?

Usually yes, and most damp course guarantees require it. The old plaster holds hygroscopic salts that pull moisture from the air, so it will keep showing damp patches even once the wall itself is dry.

How high does the plaster have to come off?

To roughly a metre above the highest salt staining, not the highest damp. Salts wick further than water, and anything left behind comes through the new work.

How long before I can decorate?

The render needs weeks rather than days before the skim, and the skim needs its own drying time after that. Budget two to three months from hack-off to a finish coat of paint, longer in winter.

My house is Victorian. Is this the right treatment?

Often not. Solid walls built before about 1919 have no cavity and are designed to let moisture evaporate. A cement render with a waterproofer seals that route and pushes the moisture elsewhere. On those walls the answer is usually lime.